fbpx

Project:

Precision Poly – Internal Equipment Structure

Location:

Grand Rapids, MI

Square Footage:

3,000SF

Industry and Building Usage:

Manufacturing

Materials Used & Special Services Required:

Design, structural steel, metal panels

Budget Scope/Estimate:

$475,000

Project Information:

FCC Construction designed and built an internal manufacturing equipment structure. Using structural steel, we designed a 4 level mezzanine to house 3 plastic extruding lines and processing equipment. This structure is located within the existing manufacturing floor and required raising the roof an additional 25’. The exterior was clad in insulated metal panels and incorporated HVAC equipment and windows for natural light.