fbpx

Project:

Tool-N-Die, Inc.

Location:

Dorr, MI

Square Footage:

12,000SF - (2018 addition of 7,200SF)

Industry and Building Usage:

New Construction

Materials Used & Special Services Required:

General Contractor, Excavation, Design-Build, Structural Steel, General Trades

Budget Scope/Estimate:

$1,100,000 (2018 addition - $600,000)

Project Information:

Project included a new 12,000 sf pre-engineered metal building with an interior office area of approximately 1,300 sf. This was a design build project with FCC working with Dixon Architecture and Exxel Engineering on the building design. Building will house a new tool & die shop which included (2) press pits and a 10 ton overhead crane. All associated site work, parking lot, and site utilities were part of this scope.